Oil and Gas Prospection

FOTO

 

Prior infrastructure is required before exploratory drilling for hydrocarbons can commence. COPSA offers a complete civil works package for all the necessary infrastructure for access and siting that are required to install a drilling rig. The work consists mainly in preparing the site (earthworks, drainage, access and enclosure), laying the conduit pipe, construction of the cellar/basement, foundations for the rig and the slurry tanks, construction of water rafts and earthing grid.